2101 L Street NW
Washington, DC
Wrecking Corp was tasked with the removal of the façade of this 10-story building, consisting of 50,000 square feet of exterior precast concrete panels. The project required a great deal of planning and concern for public safety since the work took place on a busy street corner in downtown DC. All sections removed were lowered to the ground with Wrecking Corp’s 90-ton-crane and haul from site to a recycling center.
2101 L Street NW prior to demolition
|
Workers removed panels individually to preserve them for reuse.
|
Panels were placed on 90-ton crane to be lowered to the ground.
|
Façade removal close to completion
|
|